Stage 4 Of a Remodel: Happily Ever After

This fairy-tale phase of a home remodel is the tail end of any major project.The Honeymoon and Midproject Crisis have passed and the Renewal of Vows has given you the strength you to continue, now we’re finally, and gratefully, just about to wrap up the ups and downs of remodeling. You are almost at the Happily Ever After phase.


Moving back into a house after remodeling can be a bit like being in love. Are you not excited to use all your new appliances or plumbing fixtures? Are you not giddy about coming home to your pristine new bathroom, kitchen or living room? Don’t deny it — you’re probably even talking to anyone who will listen about your new space.


During this Happily Ever After stage, the work is finally done! At last, there are no more nail guns and saws and vacuums making noise in your house. After months of destruction and disarray, it’s time to move back in and enjoy your home, sweet home. And though most of this phase is just you at last having the chance to enjoy the fruit of your general contractor’s labor, there are a few odds and ends that your contractor will be taking care of to make sure your Happily Ever After really lasts forever.


Cleaning 


This should happen before you move back into your home. Since day one of demolition, dust and debris have been thrown into the air and, much to your contractor’s chagrin, have crept into other places in the house that weren’t touched in the remodel. Now’s the time to do an all-inclusive clean. No, the cleaners won’t do your laundry for you, but they’ll do just about everything else, from polishing the floors to dusting the ceiling fans. The end-of-project clean is like a cleansing spa day for your home.


Final Walk-Through 


The last walk-through ensures that you are completely satisfied with everything — and I mean everything — in your home. This is where you will have the chance to sit down and bring up all the odds and ends that you feel need to be addressed. This can be anything from “this faucet isn’t on straight” to “there’s a scratch on the new fridge” to “my shower isn’t draining correctly.”

Contractors may vary on when they hold a final walk-through, it’s usually scheduled after the homeowners move back in and have a chance to use the new space. Your contractor should’ve caught just about everything during his or her own informal walk-throughs throughout the remodel, but sometimes there are items that just don’t come to the surface until a house is lived in.


Warranty Begins 


Most builders and remodelers have a warranty for their projects. The length and amount of coverage can vary, but what remains constant is the promise to stand behind their work for any unforeseen circumstances that arise and need addressing. 


[If you’re looking at contractors right now, ask them about their warranty. This can be very telling of how they conduct their business. The more that contractors are willing to warrant their work — or the longer the warranty — the more effort they will put into getting the job done right the first time.]


For some contractors, the warranty formally begins after the final walk-through is hosted and the last payment is received. After that, some will stand behind any light fixtures that fizzle, appliances that break, tiles that come loose — you name it. In an ideal world, everything would work right the first time, and it would work right forever. In our world, however, there are bad manufacturing batches and recalls and oversights that may need to be taken care of. Fear not. If you have selected the right remodeler, these issues will be handled.


What else is involved? Absolutely nothing. Take a deep breath, look around at your new place and smile, knowing that it’s all yours, to have and to hold from this day forward, for better, for worse, for richer, for poorer, in sickness and in health, to love and to cherish till death do you part.

Read

Stage 3 Of A Remodel: The Renewal of Vows

Passing the midway point of a remodel can be an exciting time. After weeks or months, of being in a state of disarray, things finally start to feel as if they’re coming together.


You’ve experienced the bliss of the Honeymoon. You’ve trudged through the Midproject Crisis. And now? Everything you’d hoped and dreamed about when you first envisioned your project is coming true, and you’re feeling ready to say “I do” all over again. It’s time for the Renewal of Vows.


You probably won’t hear your contractor refer to this phase as such. Just as the Midproject Crisis is more commonly referred to as the mechanical rough-in stage, this phase has other, more industry-standard names. You will probably hear words like “finish out,” “trim out,” “mechanical trims” or “finishes.”


And, as you can probably guess, this phase is about finishing and beautifying the work that was started in the first couple of months. There’s a lot that may be involved in the finishing stage of your job, depending on your scope of work, but here’s a list of the most common steps that happen during this phase.


Sheetrock

Holes made during rough-in will be patched, new Sheetrock will be put up at any new walls or ceilings, and texture will be applied to make your walls look like walls again.


Trim Carpentry

There are a few different types of trim that may be installed at this phase: baseboard, door and window casing and crown molding. Trim is purely optional — some more contemporary designs forgo it entirely — but it is meant to create a finished look.


Cabinetry

The installation of cabinetry is when the kitchen starts looking more like a kitchen, but it’s also when you can visualize how your other storage pieces, such as built-ins and bathroom cabinets, will change the function of your home.


Electrical and Plumbing Trim

This is the other big “wow” that comes with the finish-out phase. A master bathroom can start to look completed when tile and cabinetry is installed, but throw in a free-standing tub and a shower full of rain heads, handheld fixtures and a steam unit, and suddenly you’re not looking at a mostly done, unidentifiable space — you’re looking at your master bathroom.

The same goes for electrical items like decorative light fixtures or appliances. Seeing new appliances being brought into and installed in your kitchen make most people go starry-eyed and drool a little. No judgment here — I’ve done the same.


HVAC Trim

I mentioned in the last installment that most HVAC work is done during the rough-in stage, so what is left? Essentially, all that needs to be done is the installation of vent covers and thermostats and maybe a little tweaking of the air-conditioning system. Nothing too exciting, but it should be noted nonetheless.


Miscellaneous

There is a lot that can be going on during the trim-out stage. Flooring — such as carpet, wood, tile or laminate — will be installed. 


Tile will go up in showers and as backsplashes. Countertops will go in. Priming and painting of walls, ceilings, trim and cabinetry will be completed. A little landscaping may even be done.


There are a million moving parts during the mechanical finishes phase. And this is exciting to see.


Just like during the Honeymoon, a lot of visibly quantifiable work is being completed. Only this time, instead of things being torn up and thrown out, they’re being brought in and installed. The puzzle pieces are finally fitting together, and you are starting to see the big picture.


Communication is still key, but patience is also important.


As you see new things being carried in and installed, it can be so tempting to begin moving back into your new space or using your new kitchen. But your contractor may still need some time and space to work.


There are last-minute items that will ultimately guarantee your satisfaction that need to be taken care of before you and your family can begin enjoying your new remodel. So hang in there, and your patience will be rewarded.


You may be thinking: There can’t be anything left, can there? That’s it, right? Everything is installed, the house looks like a house again, time to move in and get settled. Not so fast. You’re almost there. Find out what final bits and pieces are involved in the end phase of a remodel, the Happily Ever After stage.

Read

Stage 2 of A Remodel: Mid-project Crisis

We covered the ins and outs of the Honeymoon Phase of construction. Next up: the Midlife Crisis. It often comes with questions like, “What am I doing? Where am I going? What is the meaning of life?”


Likewise, the second phase of a home remodel, the Midproject Crisis, is paired with similar questions: What’s my contractor doing? Are we still moving forward as planned? Was this really all worth it?


Fear not: Your contractor is working hard, your project is moving forward and, yes, your decision to renovate your home is, and will be, worth it.


Typically, once demolition and framing is finished and before sheetrock is put up, mechanicals or mechanical rough-in will begin. Mechanicals refer to the guts of the house: electrical; plumbing; and heating, venting and air conditioning (HVAC). Like our own guts, most of the work done during mechanicals occurs behind the scenes.


So what is going on behind the scenes? Let’s break it down by type of work.


Electrical


The groundwork for all new light fixtures, outlets, switches and appliances will be done during this phase. New wiring will be run in the walls and ceilings, electrical boxes will be installed for future fixtures, and electrical panels may be upgraded so they can handle heavier loads. At this point, electricians are making sure that everything that will need power will have access to it and meet your municipality’s building code.


Plumbing


As with electrical, plumbing rough-in ensures that all plumbing fixtures, appliances and other water features will be supplied with water, gas or both. So pipes may be moved or installed in new places, shower pans are installed and inspected, and gas lines may be moved, extended or even put in.


HVAC


Unlike electrical and plumbing, HVAC is the only mechanical where nearly all the work is completed during the rough-in stage. Pathways for new vents are determined and vents are installed, air conditioning units may be replaced, and air return vents are located in appropriate positions.


All this sounds exciting, right? No doubt, it is. But the progress isn’t very visual. Since everything occurs behind walls, under foundation or in attics, the big “wow” just isn’t there like it is when everything is torn apart.


It’s around this time that I’ve often seen homeowners concerned about progress. Yes, plumbers are there, but where are the new sinks? Why isn’t there a single light fixture installed yet? Is the HVAC guy even working, or is he just taking a nap in the attic?


The other contributing factor to the crisis is the fact that any speed bumps that crop up during this phase take a bit more time to resolve. Overall, the placement of existing framing is the biggest obstacle in mechanical rough-ins.


If your plans specify that there is going to be a can light in Location A, but Location A has a structural beam directly above it — no can do. Or say your architect has designated a toilet to be mounted on the wall instead of on the ground, but existing wall framing prevents this from being a viable option. Back to the drawing board. Or maybe your HVAC contractor needs to be able to provide ductwork to a new vent hood location in your kitchen, but there is no open attic space to place the ducts. Time to think through the alternatives.


Another obstacle, which is less common but should still be noted, is the condition of existing mechanicals. Any wiring, plumbing or venting that is found to be damaged, dangerous or just not up to par with your municipality’s building code will likely need to be remedied.


And don’t even get me started on inspections. If your job is permitted, inspections for mechanicals will occur during this stage. City building inspectors are well known for being thorough. If you don’t have everything just right, they will not hesitate to make your contractor fix the issue before any work can continue.


And finally, don’t forget to communicate with your remodeler. If you don’t understand something about mechanical rough-in, ask. If you’re concerned about the placement of pipes or wiring, say something. If you want an update on project status, request one.


I know it may be tempting to ask for advice from your neighbors who remodeled their house last year or your friend whose cousin’s husband is an architect, but in the end, the person with the most knowledge about your project is your building professional. See if you can get on your contractor’s schedule for a recurring weekly meeting. It will help make the Midproject Crisis less of a crisis.

Read

Stage 1 of A Remodel: The Honeymoon

As with anything in life, a remodeling project comes with its ups and downs. Certain phases seem to go at lightening speed, while others feel like they’ve lasted a lifetime, all while it looks as though nothing is being completed. Fear not — this is typical. While every project is different, a good portion of renovations have four major phases: Honeymoon, the Midproject Crisis, the Renewal of Vows and the Happily Ever After.


Let’s look at the Honeymoon Phase of renovating.


After weeks of searching for a remodeler in your area, calling references, and working toward an agreeable price, you say, “I do,” sign the contract, finalize the design and begin work in two weeks. There’s a little nervousness in the air, but as you enter the Honeymoon phase, the mood is mainly one of excitement.


Demolition Begins


A couple of weeks go by, and the day comes for work to start. Protective products are placed, and demolition begins. Demo, normally one of the quickest moving stages of a remodel, demolition makes it look as if a lot of work is being done practically overnight. Cabinetry is removed, walls are torn down, appliances are taken away and, in a matter of days or weeks, you’re staring at a blank canvas.


After that, any necessary framing and structural work will begin. Framing usually isn’t as exciting or fast-paced as demolition, but still, there is visible progress. At this point, you are walking on air. The rate of work is astounding, and you’re still very excited about the entire project.


Speed Bumps Ahead!


However, like a delayed flight, there are obstacles that can slow down this phase, specifically during demo. If you’re living in an older house, there’s the possibility that when your walls are opened, asbestos or lead could be discovered, which will need to be dealt with before work can continue.


Another common speed bump is building permit delays. Going through government-mandated processes can be tricky sometimes, especially if you or your building professional don’t have everything you need to get the green light from your municipality the first time around.


More holdups can come from structural elements that become apparent after demolition. For example, say you were going to move a door to another wall in your dining room. Once the demo crew opens up the wall where the new door will be installed — surprise! — there are plumbing pipes running the height of the wall. Reconfiguring design to meet these new requirements will add time to the demo stage.


Don’t panic. These delays happen often, and it’s worth accounting for and accepting these hurdles before you even begin to think about renovating.


Rolling With the Punches


To help your honeymoon run more smoothly, here are a few tips:





Really. Get to know it on a personal level. Because no matter what room you’re touching, it’s likely that you use that room daily. The sooner you accept that this room will be unavailable for a period of time, the sooner you’ll be able to adapt your daily routines to fit around it.


Love Your Microwave


This applies to kitchen remodels specifically. As soon as demo is done, your primary cooking and eating area will be gone. Before your project starts, find an untouched room in your home to create a mini kitchen that will include necessities such as a microwave, toaster oven and coffee pot. Think of it as the mini kitchen you had in your dorm or apartment in college and revel in the nostalgia.


Don’t Worry Too Much


I know this sounds hard — OK, really hard, especially for control freaks — but trusting your building professionals to know what they’re doing will really help you keep your head on straight. And if you do have questions or concerns talk to them.


Communicate! 


Communication has proved time and time again to be one of the biggest parts of a remodel — and a successful marriage. Talk with your contractor, talk with your significant other — talk, talk, talk. Ask framing questions, bring up budgetary concerns, muse over paint colors. Whatever is on your mind, getting it out of your head and into the air is beneficial for everyone involved.


Remember: 


The Honeymoon phase of a remodel is definitely one of the high points in a process with numerous peaks and valleys, so try to enjoy it. No matter what you may encounter during demolition and framing, it’s likely that the mood of everyone on board — you, your contractor, your family and even your pet — will be very positive.


You’ve just embarked on a new journey, and the excitement of watching the image of your new home come into focus just adds fuel to your fire. Revel in that post-contract-signing bliss and maybe enjoy a glass of your favorite beverage while you imagine the new space that will be formed in your newly torn-apart home. Enjoy it, because what lies ahead is a bit uncertain.

Read

What To Ask A Landscape Designer

If you’re considering working with a landscape designer, finding the right fit — and avoiding surprises midway through the project — is largely about knowing which questions to ask upfront and being familiar with the range of services these professionals provide.


First, Get Your Ducks In A Row


Before reaching out to a professional, write a wish list for your garden remodel, establish your priorities and budget, and decide which parts of the process you’d like to hire a pro for help. With this on paper, you’ll have a clear sense of what you’re looking for in a designer before you begin to contact professionals.


Questions to Ask


What Services Do You Offer? 


First and foremost, determine what services a landscape designer offers to see if he or she is the right person for your project. The best question a client can ask is: ‘Are you experienced with the scope of work we want, and can you design and manage it?’


Generally speaking, landscape designers fall into one of three categories, depending on the services they offer:


Design Only


Some designers specialize only in the design process. This typically includes a site analysis and discussion of a client’s needs, a preliminary design, revisions based on your feedback, and a final detailed master plan for your garden. This detailed planting plan and construction document is then handed over to you (or a landscape contractor of your choosing) to take it from there.


Design-Build


Others offer the design service described above, as well as overseeing plant purchase and all installation. Contractors are needed for permitting and hardscape installation — sometimes the landscape designer is also a registered contractor, and other times they have landscape contractors on their team or ones to recommend and oversee.


Full service — Design-Build and Maintenance Program


For the highest-touch service, some landscape designers will offer all the above, plus oversee ongoing maintenance of the garden.


Can I See Examples of Your Past Work? 


Consider the style of the designer in relation to the garden you want. If you want a modern city garden, have they designed any before? Or if you are looking for a cottage-stye garden, do they have the plant knowledge to deliver?”


Alternatively, if a designer’s portfolio doesn’t include the particular style you’re looking for, check out his or her credentials for evidence of the training to make the vision of your garden a reality. Degrees from accredited landscape design colleges and memberships in professional organizations are both good indicators.


Do You Offer Garden Consultations? 


Some landscape designers will offer one- to two-hour garden consultations. During this meeting, a designer will typically come over to your property, join you for a walk around the garden, listen to what you’d like to accomplish with your remodel and begin to bounce some ideas around for the design.


This is a great opportunity for you to determine whether you have a fit with the designer, and for the designer to see if he or she fits with you as a client. It is important for you to determine what role you want to play. Are you interested in a collaboration, [want to] defer completely to the designer or have a clear idea for your garden and just want someone to implement it?


Don’t expect an initial consult to be free of charge — it is, after all, one or two hours of a professional’s time — though some designers will put the consult fee toward the cost of the design if you end up hiring them.


What Ideas Do You Have For Our Garden? 


After you’ve shared your wish list and budget with the designer, and the designer has had a chance to view your property, ask what vision the designer has for your landscape. Designers have different mediums of presenting their ideas for your landscape, ranging from a collage-style mood board with inspiration images for plants and hardscape materials to a two-dimensional, to-scale drawing created with a CAD program or by hand.


This is the time to speak up about what you like and dislike in the design or if you see anything that’s missing from your wish list — for example, more space for tool storage, room to grow vegetables or an area with shade. Following this meeting, a designer will draw up a revised design drawing based on your feedback.


What Is Your Process? 


A designer’s process depends on the services he or she offers. Get to know the process — and whether you or the designer is responsible for overseeing each step — from the beginning so that you’ll know what to expect once the project is underway. If you’re hiring a designer who specializes in design only, ask yourself whether you have the time or experience necessary to oversee the project installation or if the designer has contractors to recommend.


What Is The Estimated Cost? 


Clear communication regarding the estimated cost of the project and your budget is essential. Ask your designer for a range of cost for both the design and the installation. Most installation estimates are drawn up by a contractor based on the cost per square foot of installing areas of hardscape outlined on the plan for the yard.


Another key question to ask your designer: “How are changes in scope handled during the design and installation process?” Given that unanticipated design changes often come up midproject, it’s important to be clear on whether a designer will charge additional fees for the time it takes to change the design plan or installation.


As a responsible client, you also need to be honest with a landscape designer regarding your budget for the project. Knowing a budget beforehand is crucial, it doesn’t mean that a designer needs to spend the budget but dictates what [he or she] can realistically design for. If a look you like is over your budget, designers often have creative ways to stretch your budget and give you the best garden for your space.


Are There Any Ways To Reduce Cost? 


Pathways, patios, retaining walls and decks are generally more expensive than planted garden areas, so the more hardscape there is in the design, the more it’s likely going to cost to install. Plus, the materials used for hardscape can vary widely for both the product and the installation.


It’s best to have a conversation with a designer when you are discussing the initial plan about ways to reduce the cost of the landscape to stay on budget. The designer will have ideas about where you can save money without compromising style, and what elements are worth a splurge.


How Long Will Installation Take? 


The time it takes to design and install a landscape depends on a number of factors: size and scope of the project, availability of contractors and other installation specialists, ordering and delivery times for materials and plants, dry weather for laying hardscape, and unexpected setbacks during installation. Instead of asking a landscape designer to have the installation done by a certain date, ask for an estimated range for the project to be completed.

As eager as you may be to enjoy your new landscape, keep in mind that skilled installation of hardscape and careful planting takes time. While landscaping on TV is inspirational and great entertainment, high-quality work takes time to install.


When Will The Garden Grow In? 


The time it takes for a garden to grow in depends on the scope of the design, what types of plants are proposed and how mature the plants are when they’re planted. A smaller area with ornamental grasses and perennials can grow in within a single season, but larger and more complex designs with trees and large shrubs can take years to reach maturity. Ask your designer which plants make sense to splurge for semimature specimens (like focal-point trees or shrubs needed for screening) and which plants can be purchased small and fill in quickly (like most ground covers, vegetables and ornamental grasses).


How Much Maintenance Will It Take To Keep The Garden Looking Good? 


Different styles of gardens and plants require very different levels of care. Be upfront with your landscape designer about how much maintenance you are willing to commit — either your own time or that of a hired gardener — going forward. Once you’ve invested in hiring a landscape designer and installing a garden, you’ll want to keep your landscape alive and flourishing for years to come. Ask your landscape designer if he or she has recommended maintenance gardeners or specialists to take care of the garden going forward.

Read
Reciprocity Logo The data relating to real estate on this website comes in part from the MLS® Reciprocity program of either the Greater Vancouver REALTORS® (GVR), the Fraser Valley Real Estate Board (FVREB) or the Chilliwack and District Real Estate Board (CADREB). Real estate listings held by participating real estate firms are marked with the MLS® logo and detailed information about the listing includes the name of the listing agent. This representation is based in whole or part on data generated by either the GVR, the FVREB or the CADREB which assumes no responsibility for its accuracy. The materials contained on this page may not be reproduced without the express written consent of either the GVR, the FVREB or the CADREB.